Swithcing supply from Mains to Alternate Source

Posted by Nigel Kelly on November 23, 2004, 02:47:19 AM

Swithcing supply from Mains to Alternate Source
Here's my scenario:

Have all the circuits at my house on Mains power from the local power company.

Install an alternate source (wind solar etc) and put it through an inverter to make good enough sine AC to power the heat and light circuits.

These would need to be dedicated circuit powering only "insensitive" devices/loads.

When the power output from alternate source(s) is high enough, have a break before make switch cut from mains to alternate power. When the alternate power source backs off again, cut back to the main circuit.

HGas this been done - does anyone know of suppliers of gear for this arrangement?

Due to laws in New Zealand it really is very uneconomic to grid tie an inverter - a long story, but trust mne... there is little money to be saved, and I don;t think there would ever be a payback if any interest is applied to the initial investment capital.

I look forward to thoughts and opinions.
MDU

 
Forums | Design by Scratchmedia | Development by SMF.
© 2001-2005, Lewis Media. All Rights Reserved.

Disclaimer and Disclosure

The Alternative Energy Store, Inc reserves the right, within its sole discretion, to refuse or delete any posting or portion thereof, or terminate or block the access to this forum.

The opinions and statements posted on this forum are the opinions and statements of the person posting same, and do not constitute the opinion or act of the Alternative Energy Store, Inc (AltE). The Alternative Energy Store, Inc does not endorse or subscribe to any particular posting. No posting shall be construed as the act or opinion of the Alternative Energy Store, Inc.

Call Us Today!
877-878-4060

Se habla Español

cart

0 items

latest posts

 

top members