I am designing a 3KW, ‘24V’ off-grid solar project. The way I see it, to float the batteries at the proper voltage (28.8VDC) I calculate the current to be roughly 105 amps at peak.
The planned battery bank will be 1150AH.
Is this calculation close?
What size MPPT charge controller do I need? . .
Can I bridge them together in parallel if need be? . .
Still trying to wrap my head around this. . .
Thank you.